IMG_8862_DxO
At the Exploratorium’s construction site: the existing pier deck between Pier 15 and 17 was evaluated, repaired, and upgraded as part of the structural scope of work. (Photo by Oliver Shay)
© 2009-2021 Green Architecture and Building Report. All rights reserved.